How this calculator works
An equipment pad — for an AC condenser, generator, or hot tub — is a small, straightforward rectangular pour. This calculator multiplies length, width, and depth to get cubic feet, then divides by 27 for the cubic yards you’d need, whether ordering bagged mix or a short ready-mix load.
Formula: Cubic yards = (Length ft × Width ft × Depth ft) ÷ 27.
Worked example
A 10 ft × 10 ft pad at a 4-inch depth:
- Depth in feet: 4 ÷ 12 = 0.3333 ft
- Cubic yards: (10 × 10 × 0.3333) ÷ 27 ≈ 1.23 yd³
- At $150/yd³, that’s $185.19 before waste.
Cost reference
| Pad size | Depth | Cubic yards | Cost at $150/yd³ |
|---|---|---|---|
| 5 ft × 5 ft | 4 in | 0.31 yd³ | $46.30 |
| 10 ft × 10 ft | 4 in | 1.23 yd³ | $185.19 |
| 20 ft × 20 ft | 4 in | 4.94 yd³ | $740.74 |
How to measure your pad
Measure the equipment’s actual footprint first, then add a few inches of margin on each side for the pad size you’ll pour — most equipment pads are much smaller than the 10 ft × 10 ft default shown here, so adjust the length and width down to match your unit before reading the result. Use the depth your equipment manufacturer specifies, or 4 inches as a general default for light equipment.
Frequently asked questions
What size pad does an AC unit or generator need?
Most residential AC condensers and standby generators sit on a pad only slightly larger than the unit's footprint — often 2-3 ft square to 4-5 ft square depending on the equipment. Check the manufacturer's installation manual for the required minimum pad size and clearance before pouring.
How thick should an equipment pad be?
4 inches is typical for light equipment like AC condensers, hot tubs (empty weight, since a filled hot tub's weight is spread by its own frame), and small generators. Heavier equipment — larger generators, HVAC package units — may call for a thicker pad or added reinforcement per the manufacturer's spec.
Should a small pad use bags or a ready-mix truck?
Small pads under roughly 1 cubic yard are usually cheaper and easier to mix from bagged concrete than to arrange a ready-mix delivery for, especially since many suppliers charge a short-load fee below their minimum order. Anything over about 1 cubic yard starts to favor ready-mix on labor alone — use the concrete bag calculator to compare bag count directly.
Does a pad need to be reinforced with rebar or mesh?
For light, non-structural equipment pads, many installers skip reinforcement or use a single layer of wire mesh for crack control. Pads supporting heavier equipment, or built in areas with poor soil, benefit from rebar — check the equipment manufacturer's mounting requirements and your local code.
Should the pad be larger than the equipment's footprint?
Yes — most installers pour the pad a few inches larger than the equipment on all sides, both for a cleaner installed look and to keep the unit's feet or mounting brackets fully supported rather than overhanging the edge.