#57 Stone Calculator
A #57 stone calculator turns length × width × depth ÷ 27 into cubic yards, then × 1.35 for tons. 200 sq ft at 4 in needs 3.33 tons, or 3.67 with 10% extra.
What your order looks like
One bulk delivery is usually easier than hauling it yourself.
2.47 yd³ · 3.3 tons
34 wheelbarrow trips (2 cu ft each)
5 pickup loads (0.75 ton each)
1 small dump truck load (6 tons each)
Rules of thumb: A wheelbarrow trip is 2 cubic feet of heavy material, about 200 lb, a load most people can push. A pickup load is 0.75 ton, the payload of a full-size half-ton pickup (1,500 lb). A small single-axle dump truck carries about 6 tons.
How much #57 stone do I need?
This #57 stone calculator multiplies length × width × depth to get cubic feet, divides by 27 to get cubic yards, and multiplies by 1.35 tons per cubic yard to get the tons you order. Quarries sell #57 by the ton, so the result is in tons, and the cost line is tons × your price per ton. Tick the waste box to add 10% to the order.
#57 is clean, angular stone about the size of a grape or a little larger. Because the fines have been washed out, water passes straight through it. That makes it the usual choice for French drains, pipe bedding, and driveway top layers.
The #57 stone formula in plain words
- Convert depth to feet: inches ÷ 12. Four inches is 0.333 ft.
- Find cubic feet: length × width × depth in feet.
- Convert to cubic yards: cubic feet ÷ 27, since a cubic yard is 3 × 3 × 3 ft.
- Convert to tons: cubic yards × 1.35.
- If the waste box is ticked, multiply tons by 1.10.
- Cost = tons × price per ton.
The 1.35 figure is lighter than the 1.4 to 1.5 used for crusher run or road base. Without fines, more of every cubic yard is air.
Worked examples
The calculator gives the same results.
- Driveway top layer: 20 ft × 10 ft at 4 in, $50 per ton
- Cubic feet: 20 × 10 × 0.333 = 66.7 ft³
- Cubic yards: 66.7 ÷ 27 = 2.47 yd³
- Tons: 2.47 × 1.35 = 3.33 tons, or $166.67
- With the 10% box ticked: 3.67 tons, $183.33
- French drain trench: 50 ft long × 1.5 ft wide × 12 in of stone, $50 per ton
- Cubic feet: 50 × 1.5 × 1 = 75 ft³
- Cubic yards: 75 ÷ 27 = 2.78 yd³
- Tons: 2.78 × 1.35 = 3.75 tons, or $187.50
- With 10% extra: 4.13 tons, $206.25
For a trench, enter the trench length as length, its width as width, and the stone depth as depth. The perforated pipe takes up a little room, but most installers ignore that and let it become part of the margin. The French drain gravel calculator handles trench fill in more detail.
#57 stone coverage per ton
| Depth | Area one ton covers | Tons per 100 sq ft |
|---|---|---|
| 2 in | ~120 sq ft | 0.83 |
| 3 in | ~80 sq ft | 1.25 |
| 4 in | ~60 sq ft | 1.67 |
| 6 in | ~40 sq ft | 2.50 |
| 12 in | ~20 sq ft | 5.00 |
These numbers are net, before the 10% allowance.
Where #57 stone works, and where it doesn’t
| Use | Typical depth | Why #57 suits it |
|---|---|---|
| French drain / curtain drain | Full trench, 2 in under pipe | Open voids carry water to the pipe |
| Driveway top layer | 2–4 in | Clean look, sheds water, less mud than fines |
| Under a shed or deck | 4 in | Drains and stops splash-back |
| Behind a retaining wall | 12 in wide drainage zone | Relieves water pressure on the blocks |
| Concrete aggregate | — | It is the standard coarse aggregate in many mixes |
| Paver base | Not ideal | Won’t compact flat; use crusher run instead |
How to measure
- Measure only the #57 layer. If the stone sits on a separate compacted base, enter just the depth of the top layer, not the whole driveway.
- Use the excavated size. For drains and footings, measure the trench as dug, which is usually wider than planned.
- Break up odd shapes. Split an L-shaped pad into two rectangles, run each, and add the tons.
- Average the depth. On sloped ground, take depth readings at three or four spots and enter the average.
Common mistakes with #57 stone
- Using it as the only base for pavers or a slab. Rounded voids let it shift under load. Put crusher run underneath where you need a hard, flat base.
- Ordering by the yard but reading tons. If your supplier sells by the cubic yard, divide the tons result by 1.35, or use the general gravel calculator, which shows both units.
- Skipping fabric in drains. Wrap the trench in non-woven filter fabric so soil does not wash into the stone and clog it over time.
- Confusing #57 with #67 or #8. #67 is a slightly smaller mix and #8 is pea-sized. Check the number on the quote before the truck arrives.
For mixed loads or other aggregate sizes, see the crushed stone calculator.
Frequently asked questions
What exactly is #57 stone?
#57 is a standard size designation for clean crushed stone, roughly 1/2 to 1 inch across with almost no dust or fines. The number refers to a sieve gradation, not a brand, so #57 from different quarries should fall in a similar size range, though the rock type (limestone, granite, trap rock) varies by region.
How many tons of #57 stone are in a cubic yard?
This calculator uses 1.35 tons (2,700 lb) per cubic yard, a typical loose, dry figure. That means 1 ton is about 0.74 cubic yards, or 20 cubic feet. Wet stone or dense rock types can weigh more, so if your quarry quotes its own figure, use that.
How much area does a ton of #57 stone cover?
At 1.35 tons per cubic yard, one ton is 20 cubic feet. That covers about 120 sq ft at 2 inches deep, 80 sq ft at 3 inches, 60 sq ft at 4 inches, and 40 sq ft at 6 inches, before any allowance for waste.
How is #57 stone different from crusher run?
#57 stone is washed and screened to remove fines, so it leaves open voids that let water drain through. Crusher run keeps the fines, which fill the gaps and let it compact hard. Use crusher run as a load-bearing base and #57 where drainage or a clean top layer matters.
What depth of #57 stone should I use for a driveway?
A 2 to 4 inch top layer over a compacted base of crusher run or road base is common. Because #57 has no fines to lock it together, it stays slightly loose and is rarely used alone for the full depth of a driveway on soft soil.
Should I add waste when ordering #57 stone?
Tick the 10% waste box for most jobs. It covers spillage, low spots in the excavation, and stone pushed into the soil underneath. On a 200 sq ft area at 4 inches, it raises the order from 3.33 to 3.67 tons.
Estimates only. Verify quantities with your supplier before purchasing.