#2 Stone Calculator

A #2 stone calculator multiplies length × width × depth ÷ 27 for cubic yards, then × 1.4 for tons: a 20 × 10 ft pad 6 in deep needs 5.19 tons.

You need—
Estimated cost—
Shop #2 Stone at Home Depot →

What your order looks like

One bulk delivery is usually easier than hauling it yourself.

3.70 yd³ · 5.2 tons

50 wheelbarrow trips (2 cu ft each)

7 pickup loads (0.75 ton each)

1 small dump truck load (6 tons each)

Rules of thumb: A wheelbarrow trip is 2 cubic feet of heavy material, about 200 lb, a load most people can push. A pickup load is 0.75 ton, the payload of a full-size half-ton pickup (1,500 lb). A small single-axle dump truck carries about 6 tons.

LengthDepthWidth
Volume = length x width x depth. Enter all three to size your #2 stone.

How much #2 stone do I need?

This #2 stone calculator finds the tons of stone for a pad or bed with one formula: length × width × (depth in inches ÷ 12) ÷ 27 gives cubic yards, and cubic yards × 1.4 gives tons. A 20 ft × 10 ft construction entrance at 6 inches deep needs 5.19 tons, or 5.70 tons with the 10% waste box ticked.

Enter the length and width in feet, the loose depth in inches, and your quarry’s price per ton. The result shows tons to order and the estimated cost.

The formula in plain words

#2 stone is sold by the ton but placed by volume, so the calculator makes two conversions:

  1. Volume: length × width × depth in feet gives cubic feet. Dividing by 27 turns cubic feet into cubic yards, because one cubic yard is 3 ft × 3 ft × 3 ft.
  2. Weight: cubic yards × 1.4 tons per cubic yard gives tons. That 1.4 figure is a typical loose, dry weight for clean stone this size.
  3. Waste (optional): tons × 1.10 when the 10% box is ticked.
  4. Cost: tons × price per ton.

Large clean stone has big voids between pieces and does not compact much, so the depth you enter should be the finished depth you want, not a compacted target.

Worked examples

  1. Default pad: 20 ft × 10 ft × 6 in, $45/ton
  • Cubic feet: 20 × 10 × 0.5 = 100 ft³
  • Cubic yards: 100 ÷ 27 = 3.7037 yd³
  • Tons: 3.7037 × 1.4 = 5.19 tons, costing $233.33
  • With 10% waste: 5.19 × 1.10 = 5.70 tons, costing $256.67
  1. Construction entrance: 50 ft × 20 ft × 6 in, $45/ton, waste on
  • Cubic yards: 50 × 20 × 0.5 ÷ 27 = 18.52 yd³
  • Tons: 18.52 × 1.4 = 25.93 tons
  • With 10% waste: 28.52 tons, about $1,283

At 28.52 tons this is usually two dump-truck loads. Confirm your hauler’s legal payload before booking delivery.

#2 stone compared with other clean stone

Stone Approx. size Tons per yd³ (typical) Typical job
#1 stone 1½–3½ in ~1.4 Very heavy sub-base, rough fill
#2 stone 1½–2½ in 1.4 Construction entrances, base course, drainage beds
#3 stone 1–2 in ~1.4 Driveway base under a finer top layer
#57 stone ½–1 in 1.35 French drains, top layers, under sheds
Rip rap 6–24 in 1.5 Shorelines, ditch armor

Sizes are typical ASTM-style gradations; your local quarry may label stone differently, so compare by actual size rather than number alone.

Tons of #2 stone per 100 sq ft

Depth Cubic yards per 100 sq ft Tons per 100 sq ft
4 in 1.23 1.73
6 in 1.85 2.59
8 in 2.47 3.46
12 in 3.70 5.19

Figures are net, before the 10% waste allowance.

How to measure the area

  • Length and width: measure the pad or bed in feet at ground level. For a construction entrance, measure from the paved road back into the site.
  • Depth: use the full thickness of stone you plan to place. Clean #2 stone barely compacts, so loose depth and finished depth are almost the same.
  • Odd shapes: split a flared entrance into a rectangle plus a triangle, or average the width at both ends.
  • Soft ground: if tires sink when you walk the site, plan for geotextile fabric first. Stone dumped straight onto mud gets pressed into it and disappears.

Common mistakes with #2 stone

  • Using it as the top layer. It stays loose. Cap a driveway base with crusher run or #57 stone.
  • Entering depth in feet. The depth field is in inches. Typing 0.5 instead of 6 gives an answer 12 times too small.
  • Ordering too short an entrance pad. A pad that ends before trucks have rolled a few tire rotations does not shed much mud. Check your local erosion-control spec for the minimum length.
  • Ignoring the price per ton. Quarry prices for large stone vary widely. Enter your real quote so the cost line means something.

For finer drainage stone, use the #57 stone calculator or the drain rock calculator. For track beds and heavy foundations, the ballast calculator uses the same 1.4 tons per yard. For a mixed project, the gravel calculator handles circles and triangles too.

Embed this calculator on your site

Free to use. Paste this into your page's HTML. Please keep the link under the calculator.

Frequently asked questions

What size is #2 stone?

#2 stone follows the ASTM D448 / AASHTO size-number system, where size No. 2 is a clean, graded stone running roughly 1½ to 2½ inches. That is about twice the size of #57 stone (roughly ½ to 1 inch) and far coarser than pea gravel. Exact gradation varies a little by quarry, so ask for the spec sheet if size matters.

What is #2 stone used for?

Mostly stabilized construction entrances, the bottom course of heavy driveways and lanes, culvert and ditch bedding, and drainage beds where big open voids move water fast. It is a base and drainage stone.

How many tons of #2 stone do I need for a construction entrance?

A pad 50 ft long, 20 ft wide, and 6 inches deep is 18.52 cubic yards. At 1.4 tons per cubic yard that is 25.93 tons, or 28.52 tons with 10% extra. Many local erosion-control specs set the minimum length and depth, so check yours before ordering.

Can I use #2 stone as a finished driveway surface?

It is not a good top layer. The large, clean stones do not lock together, so they roll under tires and are hard to walk on. Use #2 stone as the base course, then cap it with 3 to 4 inches of crusher run or #57 stone.

How is #2 stone different from ballast?

They overlap in size and both run about 1.4 tons per cubic yard in this calculator. Ballast usually means angular stone graded for railway track beds, while #2 stone is the general construction name used for entrances, sub-bases, and drainage.

Should I add waste when ordering #2 stone?

Yes. Tick the 10% waste box. Big stone settles into soft subgrade and spreads unevenly at the edges, so a 5.19-ton order becomes 5.70 tons. On very soft or muddy ground, consider adding geotextile fabric underneath rather than just more stone.

Estimates only. Verify quantities with your supplier before purchasing.